Skip to main content

Buying guide · 5 min read

What a tiled bathroom actually costs

Almost everyone budgets the tile and forgets the other two thirds. Here's the whole list, so the quote isn't the first time you see it.

Written by the team at AMG Tile & Stone, Richmond BC. Last updated .

The tile is the part you can see on a price tag

When people picture a tiling budget, they picture a number per square foot. It's the only figure on display in a showroom, so it's the one that sticks. Then the quote arrives and it's two or three times what they had in their head, and the natural conclusion is that someone's trying it on.

Usually nobody is. The material is genuinely a minority of the job. Everything underneath it, around it and after it is the rest, and almost none of that has a price tag on a rack.

Everything else a tiled floor needs

Taking the old floor out, and paying to dispose of it. People consistently underestimate this one, and on a small bathroom it can rival the cost of laying the new tile.

Getting the surface flat. Levelling compound or a float coat, which is not optional with large format, and which nobody can price accurately until the old floor is up.

An uncoupling or waterproofing membrane where the build-up calls for one. This is the line people are most tempted to cut, and the one that decides whether a crack in the subfloor becomes a crack in your tile.

Adhesive and grout. Small numbers individually; not nothing across a whole floor. Epoxy grout costs several times what cement grout does.

Trim and transitions. Edge profiles, thresholds, the strip where tile meets the hallway. Easy to leave out of a budget and impossible to leave out of a finished room.

Labour, which on most residential jobs in Metro Vancouver is the single largest line. Awkward layouts, lots of cuts and large format all push it up.

Why the cheap tile sometimes costs more

A poorly calibrated tile, the sort that turns up bowed or varying in size between pieces, takes longer to lay. The installer ends up using levelling clips, opening the grout joint wider to hide the variation, and working slower. You pay for that in hours.

That's why we'd rather sell you a properly calibrated tile at a slightly higher price per square foot than the cheapest thing on the floor. On a whole bathroom the labour difference can swallow the saving whole.

What we can price and what we cannot

We can give you the material cost precisely: tile, trim, adhesive, grout, membrane, delivery. Those are ours and we'll put real numbers on them inside one business day.

We can't price your labour, because we're not the ones doing it and anyone who quotes you installation sight-unseen is guessing. What we can do is tell you which parts of the job tend to catch people out, so you can ask your installer about them before you sign rather than after.

How to get a quote that holds

Measure before you shop, or use our calculator, so you're pricing the real area rather than a guess.

Decide the layout early. Herringbone is not a late-stage change; it alters both the quantity and the labour.

Ask your installer specifically about levelling, membrane and disposal. If those three aren't in the quote, the quote isn't finished.

Buy the whole job in one lot. Running short mid-job is the one mistake that costs money and looks bad permanently.

Easier to settle in person

Send us the room and we'll come back inside one business day with materials, quantities and pricing. Or come by 3751 Jacombs Rd #115 and we'll work through it with you at the counter.

Get a quote Visit the showroom

Still have a question?

Tell us about the job and we'll come back inside one business day with materials, quantities and pricing. No charge, and no one will chase you afterwards.

  • A reply from a person, not a form letter
  • Quantities worked out properly, overage included
  • We'll say so when the cheaper tile is the better call
What are you tiling?

Call Directions Get a quote